University District under construction

November 16, 2016

The Trust is entering the stripping and grading phase of  development for the University District. We are working proactively to minimize the impact on our neighbours with a number of measures:

  • Reduced hours of operation in the evening over and above the City’s noise bylaw. No work permitted before 7am or after 9pm
  • Regular watering to prevent blowing dust.
  • Limited hauling routes for trucks transporting soil to other locations, on and off-site. The Trust is also working with Alberta Health Services to minimize hauling activity on roadways during Foothills and Children’s Hospital staff shift changes.
  • Regular street sweeping on periphery and internal main roads to clean up potential messes from hauling trucks.
  • Erosion control measures such as silt fences and v-ditches to prevent soil from moving outside of the construction area

Read the Stripping & Grading Fact Sheet for more details.

QUESTIONS & CONCERNS
For quick response to questions or concerns 24 hours per day, please call the Trust Hotline at 1-855-400-5556.

You can also visit www.wcdt.ca/construction for regular updates.


Join the Discussion

Comments are moderated before being posted. Your email address is required but will not be published.

Join our email list for more information and our newsletter.

Discover NW Calgary's most interesting places, people and things

Visit Our Channel

Looking for something to do in NW Calgary?

Check Out Our Event Calendar

The University District blog is a resource for Calgarians who want to live, work, play, visit or buy in the northwest. We will provide you with information, stories, news and inspiration about the things that matter so you can live a more inspired, active and connected life in NW Calgary at University District… Life works here.

Join our email list for more information and our newsletter.